Work in progress can be tracked for domestic and for imports. For each manufacturing plant, you can define your own routing and "reporting points". Examples of reporting points are Cut Ticket Approved, Cut Ready, Fabric Received, Fabric in Transit, Finished Goods in Transit, quality control, etc. The reporting points are defined by you and your team, and can be different for each manufacturer. Inventory level is tracked for each reporting point.
You can track your Work in Process using bundle tickets (bar coded) printed automatically based on the operations defined when creating the cost sheet.
This module is designed for integration to Unit Production Systems.
WIP for imports tracks goods as they are routed throughout foreign manufacturers. If desired, we can provide your vendors the tools to update your WIP as it moves through their factory using state-of-the-art technology (XML messages).